CO₂ Value Europe member D-CRBN has selected Worley to provide engineering services for its renewable syngas demonstration plant in Antwerp, Belgium. The project marks an important step towards industrial demonstration of D-CRBN’s plasma technology and future commercial-scale deployment.
Advancing Renewable Syngas Production
The demonstration plant will use D-CRBN’s proprietary plasma technology to convert CO₂ and biomethane into renewable syngas using electricity. Syngas is an important feedstock for the production of fuels, plastics and chemicals, offering an alternative pathway towards lower-carbon industrial products.
The project aims to demonstrate the technology in an integrated industrial setting and generate the operational data and engineering insights needed to support further scale-up.
From Demonstration to Commercial Deployment
Worley will deliver the plant design, including the safety and cost studies required to support construction. The engineering scope builds on an existing collaboration between the two companies, which has included work on syngas purification, reactor scale-up assessment and industrial planning.
The modular demonstration plant is designed to produce 200 tonnes of renewable syngas per year. The project will also establish an engineering foundation for a future commercial facility with an approximate annual production capacity of 10,000 tonnes.
Supporting Industrial Carbon Circularity
By combining CO₂ utilisation with biomethane and electricity, D-CRBN’s technology aims to provide an alternative source of carbon feedstock for the chemicals and fuels sectors. The project illustrates the role of innovative CCU technologies in developing lower-carbon production pathways and supporting the transition towards a circular carbon economy.
The next phase will focus on engineering development and preparing the demonstration plant for construction, bringing D-CRBN a step closer to commercial deployment.
Please read the full announcement here.